Address: 300 East Putnam Avenue, Greenwich, CT
Services: General Contracting
Construction Type: Religious
Size: 24,000 sf
Contract: $3,600,000
Architect: Perkins Eastman
Engineers: The Disalvo Ericsson Group/Robert W. Schunk
Project Description:
- New 7,500 square foot three story addition with a caretaker’s apartment, youth meeting room, lounge and eight classrooms. Exterior was designed to match the existing building.
- Renovation of a 17,000 square foot two story existing wing that required the removal and replacement of the roof structure while keeping a portion of the first floor operational. New plan included 12 classrooms, nursery, media center, offices and restrooms.
- Work in existing building included new mechanical, sprinkler, life safety systems throughout, code required upgrades and minor alterations.
- Site work included the reconfiguration of the parking area and the installation of a new traffic signal at the entrance off of Route 1.
Property Map