Address: 5 High Ridge Park, Stamford, CT
Services: General Contracting
Construction Type: Healthcare – Outpatient
Size: 11,000 sf
Contract: $1,644,000
Architect: MBH Architects
Project Description:
- This two-phased expansion project included a new lounge, pantry, corridor, two new operating rooms, and locker rooms complete with new bathrooms.
- The first phase consisted of the complete demolition of the existing lounge and locker room area. Significant MEP relocations and upgrades included new osmosis water filtration system and HVAC systems.
- In the second phase, two new air handlers complete with humidifiers, UV sterilizers, and a new rooftop chiller were part of the MEP work.
- Sheet vinyl with an integral cove base was used on the flooring throughout the new corridors, operating rooms, and the new soiled utility room. Surgical wash stations were installed in the corridor outside the operating rooms.
- The new operating rooms were finished with 1/8” Altro Whiterock, new surgical lighting, and medical gas columns.
- Through careful coordination, there was little to no disruption to the adjacent medical office, which was fully operational throughout the project.
Property Map