Highlights

Address: 100 Redding Road, Redding, CT

Services: Construction Management

Construction Type: Senior Living

Size: 29,700 sf

Contract: $6,600,000

Architect: Stein|Troost Architects

Project Description:

  • Project involved the conversion of 10 existing two-bedroom independent living apartments on two floors of the Spruce Building into 20 new one- and two-bedroom assisted living units with kitchenettes.
  • Completed within 8 months with careful logistical planning to minimize disruption to the senior housing campus.
  • The facility features a new 4-story elevator addition to service all 4 stories of the Spruce Building.
  • A new connector walkway was constructed between the existing central building and the Spruce Building.
  • Additional work included a new HVAC system for the new assisted living units tied into the campus BMS system and a new whole building generator.
  • Amenities include a dining room with a warming station servery, common areas consisting of two separate activity rooms, a living room, a library with electric fireplaces, and two ADA-accessible courtyard patios.
  • Renovated spaces have custom millwork throughout, including crown molding, lean rail, wood base, custom fluted and paneled pilasters, and cherry wood-stained coffered ceilings in dining rooms and living rooms.
  • Construction management services included: constructability review, budgeting, value engineering, subcontractor bid and award, safety and logistical planning, pre-purchase program, scheduling, and construction.