Highlights

Location: 301 Strawberry Hill Avenue, Stamford, CT

Services: Construction Management

Construction Type: Religious

Size: 30,000 sf

Architect: Dennis Noskin Architects

Project Description:

  • Multi-phase project to renovate and expand on the Congregation’s existing 1964 (original) and 1984 (addition) buildings.
  • All MEP systems were upgraded throughout, including a new transformer, lighting, HVAC systems—both heating and cooling, and both new and renovated restrooms. The Congregation was retrofit with an all new fire suppression system to meet modern code requirements.
  • Exterior upgrades included an Israeli stone façade and both ballistic and mirror-reflective glass to provide the Congregation with an added level of safety.
  • Three of the five phases included ground-up additions to provide the Congregation with new classrooms, administrative space, an egress stairwell, and an expanded entry lobby on the first floor with a larger gathering space on the floor above. All areas of the building received cosmetic upgrades including new carpet, ceilings, and wall finishes including both stone and millwork paneling.
  • The project site was tied together with all new paving, sidewalks, and landscaping.