“We have finished the Community House after what is well over three years. The difficult decision-making process on the part of the church cannot have been easy for your company. I am most appreciative of your commitment, and for how successfully A.P. performed. It was a pleasure to work with you all. I don’t think anyone ever thought the tired old building would be restored to such a handsome space, both inside and out – and people could not be more pleased or admiring.”

Highlights

Address: 395 Round Hill Road, Greenwich, CT

Services: Construction Management

Construction Type: Religious

Size: 6,000 sf

Contract: $1,200,000

Architect: James G. Rogers Architects

Project Description:

  • Complete exterior and interior renovation of 1926 church meeting house, in two phases over two summers.
  • Exterior work included a parking lot expansion with new landscaping and lighting, handicap space re-configurations, handicap walks, ramps and rails to the meeting house.
  • New building entrance stairs and doors, roofing, gutters and downspouts, and siding and trim were installed.
  • Lead paint abatement was performed with removal of old exterior siding and trim.
  • Windows were replaced with energy-efficient low-e glass units.
  • Interior work included abatement and removal of hazardous materials, new electrical service and life safety components, new drywall over existing plaster walls, and painting throughout that included historical refinishing of 83-year-old wainscotting.
  • New millwork, wood flooring, stage flooring, handicap ramps, stairs, and storage areas were installed.
  • Each phase was commenced and completed in less than 2 months.
  • Construction management services included: budgeting, value engineering, subcontractor bid and award, safety and logistical planning, scheduling and construction.

Property Map