“A.P. Construction’s responsive attitude towards the needs of Greenwich High School, and their professionalism and cooperation with the Town of Greenwich, resulted in strong relationships and a productive work environment. Their ability to create a revolving schedule maximized productivity while minimizing disruptions to the educational process.”

Highlights

Address: 10 Hillside Road, Greenwich, CT

Services: Construction Management

Construction Type: Education – K-12

Size: 350,000 sf

Contract: $40,000,000

Schedule: Five years

Architect: Antinozzi Associates

Project Description:

  • Five-year joint-venture project with O&G Industries.
  • Multi-phase renovation of existing buildings included improvements to auditorium, media center, classrooms and locker rooms.
  • Phase two addition consisted of a 75,000 square foot state-of-the-art science building, a superior weight training room, and a dance studio.
  • Project work to the existing pool area included a new rollout filtration system and an increase to the pool level.
  • Complete asbestos abatement.
  • Exterior site enhancements complete with a new drainage system and landscaping.
  • Construction management services included: constructability review, budgeting, value engineering, subcontractor bid and award, safety and logistical planning, scheduling, phasing and construction.

Property Map